• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

+65 6496 0330

  • Youtube
  • Linkedin
  • Singapore
    • 中文
    • 台灣
    • Denmark
    • English
    • English / CH
    • Français
    • Français / CH
    • Deutsch
    • Deutsch / CH
    • Deutsch / AT
    • Italiano
    • 日本語
    • 한국어
    • Português
    • Español
Newsletter

Search

  • Linkedin
  • Twitter
Particle Measuring Systems
Without measurement there is no control
Get a Quote
  • Home
  • Products
    • Aerosol Particle Counters
    • Liquid Particle Counters
    • Microbial Samplers
      • BioCapt®Certificates of Analysis
    • Compressed Gases Particle Counters
    • Molecular Monitors
    • Environmental Monitoring Systems
  • Education
    • Knowledge Center
      • Application Notes
      • Videos
      • Webinars – Archived
    • Particle College
    • Software / Data Management
    • Blog
  • APPLICATIONS
    • INDUSTRIES
      • PHARMACEUTICAL
      • SEMICONDUCTOR
      • PHOTONICS&OPTICS
      • AEROSPACE
      • Cosmetics & Personal Care
    • Annex 1
    • ISO 14644
    • 21 CFR 11
    • ISO 21501-4
    • USP 788
    • USP 797
    • PARTS CLEANLINESS TESTING
  • Service and Support
    • Advisory Service
    • Product Calibration and Service
    • Customer Service
  • About Us
    • Contact Us
    • Why PMS
    • Particle Measuring Systems’ Executive Team
    • Particle Measuring Systems’ Careers
    • Corporate Responsibility
    • COBE
    • Parent Company
    • Press Releases
    • Credibility & Registrations
    • Trademarks & Patents
News Blog
April 9, 2020 02:30 PM

How to Achieve Quality by Design (QbD) in a New Pharmaceutical Fill Line: Surrounding Areas (Series Part 2 of 6)

Written by Maurizio Della Pietra

Quality by Design Surround Areas

The area surrounding an isolator/RABS pharmaceutical fill line can be a difficult area to control. There are many functions and moving parts that support the fill operations that occur in the controlled area just outside the controlled area that can greatly impact the process itself. Below are several pitfalls to be aware of that might be thwarting your contamination control efforts if you are currently working with a piece of fill equipment that did not include QbD in the design phase.  Additionally, read on to see how these consequences might be reversed with a thorough QbD analysis, even after the fact.

 

Contamination control considerations for the areas surrounding fill lines designed WITHOUT QbD:

Problem: The Isolator cleanliness grade was classified without a workstudy, and therefore there is not a defendable rationale for clean area classification.

It is difficult to control all contamination entering the filling machine from the primary packaging, ambient environment and operator handling. Depending on the workflow and function of the area, you may be asked to defend your choice of classification by regulatory bodies.

Problem: The flow of materials likely takes the path of least resistance for your facility but may or may not follow the real needs of the process.

The equipment design was determined by ease of engineering or cost, not to the process (yield, duration, and control of the contamination). Consequently, there are now:

  • Too many procedures to cover the process flow design gaps
  • An increase in extra activities in the surrounding area
  • A decrease in production yield due to inefficiencies
  • An increase in contamination events due to inefficient materials flow

 

Contamination control considerations for the areas surrounding fill lines designed WITH a PMS QbD solution:

Surround

  • Workstudy/process flow evaluation is necessary for a justified & documented determination of the right clean area classification (C or D) for the room.
  • A thorough evaluation of material handling by personnel and equipment before it is introduced to the isolator is necessary to establish what is best for the process.

Incoming Materials

  • An evaluation should be performed to determine the best method to introduce materials into the isolator. This might be by conveyor, manual or other method determined to sufficiently limit environmental contamination or that inherent to the incoming materials.
  • Evaluation of the positioning of RTP ports, gloves and pass boxes for decontamination

Material Storage and Handling

  • An optimization study of material storage (type and quantity) is recommended to control baseline contamination in the area.
  • Evaluation of the positioning of RTP ports and gloves for maximum functionality and access to the storage areas.

Outgoing Materials

  • A process optimization should be performed to determine the least impactful and most efficient way to move materials out of the area.
  • Perform an evaluation of the positioning of RTP ports and gloves for maximum functionality and access to the exiting product.

In the next blog in this series we will examine what cleaning and disinfection on a new fill line looks like with and without QbD implemented at the design phase. These examples come from real-world applications experienced by the Particle Measuring Systems’ Advisory Services Team. Our team has over 70 years of collective experience working in and advising cleanroom users around the world.

 

Click here to learn more about how our Advisory Services Team can help you identify problems and suggest solutions to preserve the high quality of your products and processes.

 

See links to additional supporting resources below: 

On-Demand Webinar: Developing an Isolator Filling Line Using a Quality Risk Management Approach

Corresponding Application Note: Developing an Isolator Filling Line Using a QRM Approach – FAQ’s

Blog: It is possible for pharmaceutical quality to be the combination of Quality by Design (QbD) and current Good Manufacturing Practices (cGMP)?

Blog: Applying Quality Risk Management to Develop an Isolator Filling Line

 

Want to read more? Jump to other released posts in this series:

  • Part 1 of 6:  Intro and Regulatory 
  • Part 2 of 6:  Surrounding Areas (You are here!)
  • Part 3 of 6:  Cleaning and Disinfection
  • Part 4 of 6:  Set up and Process Interventions 
  • Part 5 of 6:  Environmental Monitoring
  • Part 6 of 6:  Activity Organization

 

Don’t miss an episode of this series. Register for updates on the right column of this page. Click here to contact our Experts for questions.

 

Filed Under: Particle Knowledge

Archives

  • January 2021 (1)
  • December 2020 (2)
  • November 2020 (5)
  • September 2020 (4)
  • August 2020 (1)
  • July 2020 (3)
  • June 2020 (3)
  • May 2020 (6)
  • April 2020 (11)
  • March 2020 (2)
  • February 2020 (4)
  • January 2020 (1)
  • December 2019 (2)
  • November 2019 (3)
  • May 2016 (1)
  • March 2016 (1)
  • February 2016 (3)

Subscribe to our news feed!

Products

  • Aerosol Particle Counters
  • Liquid Particle Counters
  • Microbial Samplers
  • BioCapt®Certificates of Analysis
  • Compressed Gases Particle Counters
  • Molecular Monitors
  • Software / Data Management

Industries

  • Pharma
  • Semi
  • Photonics & Optics
  • Aerospace
  • Industrial Manufacturing

Service & Support

  • Advisory Service
  • Product Calibration and Service
  • Customer Service

Knowledge Center

  • Application Notes
  • Particle College
  • Videos
  • Blog

About Us

  • Contact Us
  • Why PMS
  • Particle Measuring Systems’ Executive Team
  • Particle Measuring Systems’ Careers
  • Corporate Responsibility
  • COBE
  • Parent Company
  • Press Releases
  • Credibility & Registrations
  • Trademarks & Patents

Particle Measuring Systems- USA

Corporate Headquarters
5475 Airport Blvd
Boulder, CO 80301

T. +1-303-443-7100
T. +1-800-238-1801
F. +1-303-449-6870
E. [email protected]

Keep in touch! Receive industry news from us:

Products

  • Aerosol Particle Counters
  • Liquid Particle Counters
  • Microbial Samplers
  • BioCapt®Certificates of Analysis
  • Compressed Gases Particle Counters
  • Molecular Monitors
  • Software / Data Management

Industries

  • Pharma
  • Semi
  • Photonics & Optics
  • Aerospace
  • Industrial Manufacturing

Applications

  • ISO 21501-4
  • Parts Cleanliness Testing

Service & Support

  • Advisory Service
  • Product Calibration and Service
  • Customer Service

Education and Training

  • Knowledge Center
  • Particle College
  • Software / Data Management
  • Blog

About Us

  • Contact Us
  • Why PMS
  • Particle Measuring Systems’ Executive Team
  • Particle Measuring Systems’ Careers
  • Corporate Responsibility
  • COBE
  • Parent Company
  • Press Releases
  • Credibility & Registrations
  • Trademarks & Patents

Particle Measuring Systems- SG

Corporate Headquarters
5475 Airport Blvd
Boulder, CO 80301

T. +1-303-443-7100
T. +1-800-238-1801
F. +1-303-449-6870
E. [email protected]

Keep in touch! Receive industry news from us:

  • Privacy Policy
  • Legal

© Copyright 2021 - Particle Measuring Systems is a Spectris company